logo
  • HOME
  • ABOUT US
  • OUR SERVICES
  • Our Projects
    • Ongoing Projects
    • Completed Projects
    • Completed Projects List
    • Ongoing Projects List
  • NEWS
  • CONTACT US
  • عربي
NEWS: Estimate the approximate cost of the project based on the preliminary plans (ground floor + first) + elevation for the project. A training course for engineers new graduates for two months.

Latest News

- Estimate the approximate cost of the project based on the preliminary plans (ground floor + first) + elevation for the project.

The company offers service study of the approximate cost of the project before the completion of the engineering design and we need to a drawing ( ground floor & first floor ) with the front elevation of the project can reach us directly by sending your request through the website of the company and comes to you within 24 hours to respond to your e-mail to you.

Newsletter
To be UpToDate with our news, Subscribe NOW!
Keep in Touch
© 2014 Al Taymaa All Rights Reserved. Powered by DarAlGailani
Visitors:39410